Friday 10 July 2015 saw the completion of the main hall heating project.
Phase
1 of this project was finished in August 2012 when we replaced the ugly
soft ceiling ducting with much neater hard ducting. The soft ducting we replaced is
commonly used in ceiling spaces and was strung with straps from the
passageway ceiling. We also raised the height of the unit and ducting
about 1.5 feet taking it out of the line of sight when you walk in the hallway. At that time, we decided to only attend to the ascetics
of the area and, as the Vulcan heater was still working with occasional
emergency maintenance, to leave the old unit in place. There is a page
on those works here. |